Candidate Profile

Dedicated and Proactive individual with 1.5 years’ experience in INSTRUMENTATION(POWER PLANT)

INSTRUMENT ENGINEER  INDIA Member from 9 months

Skills

Education

  • AALIMA MUHAMMED SALEGH COLLEGEOF ENGINNERING(ANNA UNIVERSITY)
     2009-2013 :  ELECTRONICS & INSTRUMENTATION
     Grade / GPA : 5.0
     Qualification : BE-ELECTRONICS AND COMMUNICATION ENGINEER

Experience

  • DELL
     2015-2016 :  TECHNICAL SUPPORT
     Yearly Salary : 1
     Job Duties : 
  • CHEMIN C&I (BHEL PROJECT) COAL POWER PLANT
     JULY 16 - March 17 :  INSTRUMENTATION ENGINEER
     Yearly Salary : 1.5 L
     Job Duties : 
    Project 2x250MW Thermal Power Plant (BHEL Project), Maharashtra, India. • Ability to read P&ID diagrams, Hook-Ups drawing, Isometrics drawings, Plant drawings. • Having exposure to Yokogawa transmitters (LT, PT, and DPT) &Smart Transmitters. • Preparation of periodical reports and emergency call response. • Assisting BHEL Engineers in commissioning Activities. • Involved in Feeder (Gravimetric Feeder) trouble-shooting with BHEL engineers. • During trail & operation involved in various activities with engineers and technicians, which was running for 72hrs for full load Operation for 250MW. • Conducting Tools box-meeting for safety work in field for our contract labors. • Worked in troubleshot with BHEL engineers in dosing system (Ammonia & Phosphate). • Planning Daily activities & following up with technicians and labors and update to the client
  • CHEMIN C& I (SEPCO1 6*600 MW POWER PLANT PROJECT)
     APRIL 17- PRESENT :  INSTRUMENT & QC CUM PLANNING ENGINEER
     Yearly Salary : 2 L
     Job Duties : 
    Role: • Looking after Erection, Quality check and planning activities of Thermal power plant project in terms of process instrumentation and control. • Proper installation of instrumentation equipments along with final alignments. • Self making of protocols for every step of work, co-ordination with Chinese, client for maintaining the quality standards. • Personally explaining the drawing details to the skilled labors and guiding them to attain fastest, quality work in-order to achieve schedule. • Management of drawing, materials, packing lists, preservation of materials, inspection of materials received and proper documentation of work follow-ups. • Examining the proper and timely, weekly & monthly execution of project. Major Project handled 1. Project 6x600MW Thermal power plant (SEPCO1 project), Chhattisgarh, India. • Involved in erection activities with erection engineers and execution E&I engineers from SEPCO1. • Erection of cable trays, laying of cable up to terminal point and Dcs Panels etc. • Erection of instrumentation and control panels like RIO/TSI panels for turbines and boilers separately and Power panels, MOV panel, VFD Panel etc. • Conducting monthly Quality meeting and Quality Training for technicians and labors. • Having good knowledge in documentation for quality, planning and calibration activities • Having Basic process knowledge about the Boiler, steam turbine, ESP, Coal handling sys, coal feeder sys, FD & ID fans. • Assisting instrument technicians in calibration of Emerson’s transmitters (PT,DPT,LT,FT),RTD,TC etc and its calibration documentation.
  • Jubal chemical Company, Saudi Arabia
     August-2015 to September-2015  :  as Internship Trainee
     Yearly Salary : INTERN
     Job Duties : 
    • Was involved in day today activities with seniors instrumentation technicians in field activities • Was involved in 3days shut-down activities work with Engineers and technicians • Participated in Software Training held on “SIMATIC MANAGER S7-300” (CPU315&313C) Connecting, Uploading, Downloading & Maintenances Conducted by AC ARABIA, Saudi Arabia (2015). • Was involved in trouble shooting of PLC in bagging unit of Cacl-chemical